V8 Conversion
Feb 02 2003 – I got the last things out of the Pinto I might need so now it is time to have fun with the car before it goes to the junkyard.
Mar 07 2003 – Pictures of the roll bar and more frame braces.
Mar 17 2003 – The rotors are mounted and wheels put on.
Mar 19 2003 – All the main frame rails are now done.
Apr 04 2003 – The car is finally home.
Apr 12 2003 – New Floorpan installed and test fitting body again.
May 02 2003 – Throttle cable and shifter cable installed and working.
May 04 2003 – Gas tank cut out and ready to weld.
May 11 2003 – Brake lines and radiator pipe installed.
May 24 2003 – Rear suspension finally put together and working right.
May 28 2003 – Gas tank put together and test fitted in place.
Jun 01 2003 – Gas tank, trans cooler, and body back on.
Jun 02 2003 – Radiator and battery tray mounted in the front.
Jun 06 2003 – Pulled the car out from under carport and cleaned it up for the show, Still no starter so it doesn’t run.
Jun 08 2003 – Pics from the town of Man car show.
Jun 14 2003 – Trunk mounted, new roll bar and some other details.
Jul 11 2003 – Installing Fuel Injection.
Jul 28 2003 – Started sorting out the mess of wiring in the car.
Aug 09 2003 – Hydraulic throttle installed.
Aug 25 2003 – Gas pedal finally fixed and working brake lights.
Sep 10 2003 – Muffler position figured out and ready for pipes.
Sep 20 2003 – Car is back from muffler shop.
Oct 10 2003 – Rear firewall and seatbelts mounted.
Nov 01 2003 – Moved pedal mounting
Feb 28 2004 – aluminum firewall cut out.
Mar 05 2004 – Pedals mounted and brakes working again.
Feb 26 2005 – Tearing down the engine to do some work to it.
Mar 04 2005 – Trying to get one of the back tires off.
